Rehabilitation of Nairobi Expressway Lower Road ,Westland.. ( Massive Progress)
Nairobi, Nairobi
Bei itatolewa baada ya maombi
Property
Imeongezwa:
Mambo muhimu
- Aina
- Zinazouzwa
- Muamala
- Ya kuuzwa
- Aina ya mali
- Property
- Imeorodheshwa
- 1 Nov 2026
Maelezo ya mali
The Kenya National Highways Authority (KeNHA) is carrying out a Ksh 4.5 billion rehabilitation and beautification project on the lower road running from Jomo Kenyatta International Airport (JKIA) to ABC Place in Westlands. Project Overview Cost: Ksh 4.5 billion. Contractor: China Road and Bridge Corporation (CRBC). Start Date: December 2025. Goal: Repair damage caused by the Nairobi Expressway construction, reduce traffic jams, and upgrade safety. Key Improvements Road Surface: Complete re-carpeting of the lower carriageway. Pedestrian Safety: New walkways with tactile paving, cyclin Contact via the original social post linked below.
Imepatikana kwenye chapisho la umma. Angalia chapisho asili kabla ya kulipa.