ቋንቋ
ወደ ውጤቶች ተመለስ
ለሽያጭ ያልተረጋገጠ

Rehabilitation of Nairobi Expressway Lower Road ,Westland.. ( Massive Progress)

ናይሮቢ, ናይሮቢ

ዋጋ በጥያቄ

Property

የተጨመረበት:

ዋና መረጃዎች

ምድብ
ለሽያጭ
ግብይት
ለሽያጭ
የንብረት አይነት
Property
የተዘረዘረበት
1 ኖቬምበር 2026

የንብረቱ መግለጫ

The Kenya National Highways Authority (KeNHA) is carrying out a Ksh 4.5 billion rehabilitation and beautification project on the lower road running from Jomo Kenyatta International Airport (JKIA) to ABC Place in Westlands. Project Overview Cost: Ksh 4.5 billion. Contractor: China Road and Bridge Corporation (CRBC). Start Date: December 2025. Goal: Repair damage caused by the Nairobi Expressway construction, reduce traffic jams, and upgrade safety. Key Improvements Road Surface: Complete re-carpeting of the lower carriageway. Pedestrian Safety: New walkways with tactile paving, cyclin Contact via the original social post linked below.

በይፋዊ ልጥፍ ላይ የተገኘ። ከመክፈልዎ በፊት የመጀመሪያውን ልጥፍ ያረጋግጡ።

ግምታዊ አካባቢ

አካባቢውን በካርታ ላይ ይመልከቱ

ምልክቱ የናይሮቢን አካባቢ ያሳያል እንጂ ትክክለኛውን አድራሻ አይደለም። ትክክለኛውን ቦታ ከአስተዋዋቂው ጋር ያረጋግጡ።

መስተጋብራዊ ካርታው በመጫን ላይ ነው። ካልታየ ከላይ ያለውን የአካባቢ ጽሑፍ ይጠቀሙ።

ግምገማና ደህንነት

የተገመገመ ማስታወቂያ ምን ማለት ነው

nyumbake ከመታተሙ በፊት ያለውን የማስታወቂያ ማስረጃ ይገመግማል። ግምገማ የባለቤትነት፣ የይዞታ ሰነድ፣ የመገኘት፣ የዋጋ ወይም የሻጩ ስልጣን ዋስትና አይደለም።

ግምገማ እንዴት እንደሚሰራ

ከመክፈልዎ በፊት

ራስዎን ለመጠበቅ ሦስት እርምጃዎች

1

ንብረቱን ይጎብኙ

አካባቢውንና የሚያሳየው ሰው ስልጣን እንዳለው ያረጋግጡ።

2

ሰነዶችን በገለልተኝነት ያረጋግጡ

የሻጩን ብቻ ሳይሆን የራስዎን ጠበቃ ወይም ብቁ ባለሙያ ይጠቀሙ።

3

ክፍያዎች ሊከታተሉ የሚችሉ ይሁኑ

ቅድመ ክፍያን ወዳልተረጋገጠ የግል ሂሳብ አይላኩ።

ተጨማሪ የተገመገሙ አማራጮች

ተመሳሳይ ንብረቶች